Final Design for Discharge Pipeline for Sewerage Pumping Station C-7 in Novi Sad Novi Sad, Serbia

Assignment Title: Final Design for Discharge Pipeline for Sewerage Pumping Station C-7 in Novi Sad Novi Sad, Serbia
Client: JKP Vodovod i Kanalizacija, Novi Sad
Staff No.: 8
Associated Firm(s): EHTING, Serbia and Montenegro
Start Date (Month/Year): April 2005
Completion Date (Month/Year): November 2005

Narrative Description of Project:
Sewerage pumping station C7 is located in Kisacka street in Novi Sad and belongs to the north part of the combined sewerage system for large shield area, including industrial complex Jug, Jase Tomca Bulevar and DTD channel. This sewerage pumping station will be temporary and will be in operation until construction of sewerage main Koste Sokice, from Kisacka street to the sewerage pumping station GC-2.
Sewerage pumping station will serve for transfer of wastewater to main sewerage main in Dositejeva Street.

Description of Actual Services Provided by ITSC:
• Site Reconnaissance
• Establishment of Project Database
• Hydraulic calculations
• Mechanical design
• Power supply and control of the pumps
• Preparation of drawings
• Preparation of the bill of quantities
• Selection of the equipment
• Determination of investment costs and operating costs
• Estimation of Total Cost of the Works
• Contract Administration and Project Management


Voltec copyright 2018 © . All right reserved
Developed by Avesta Group and powered by Microsoft Azure