Assignment Title: Final Design of the Water Intake, Treatment Plant, and Pump Stations at the Water Source of the Regional Water Supply System for the Coastal Region of the Republic of Montenegro
Client: Public Enterprise for Water Supply, Waste Water Treatment and Drainage and Solid Waste Disposal “Crnogorsko Primorje” -
Budva
Staff No.: 12
Associated Firm(s): Scott Wilson, UK
Start Date (Month/Year): April 2007
Completion Date (Month/Year): November 2007
Narrative Description of Project:
Regional Water Supply System (RWSS) consists of water intake, water treatment plant (WTP), treated water pumping station and water transmission pipeline. The water transmission pipeline is divided into 2 parts: continental part and coastal part (northern and southern part). In the system are foreseen several break pressure tanks (BPT), pumping stations (PS) and reservoirs BPT and PS Station
Description of Actual Services Provided by ITSC:
• Site Reconnaissance
• Establishment of Project Database
• Data Collection Memorandum
• Supervision of investigation works on the water source: water quality, water source capacity, determination of zones for sanitary protection of the source
• Process calculations and preparation of technical specifications
• Hydraulic calculations
• Power supply and automatisation of the plant
• Preparation of drawings and bill of quantities
• Determination of investment costs, operating costs and influence on price of potable water
• Estimation of Total Cost of the Works
• Contract Administration and Project Management